T&D Interconnection
Large Generators and Loads
Large load requests and utility-scale interconnection
Simplify Complex Utility-Scale Interconnection
Large load requests and utility-scale interconnection projects create common pain points for transmission owners and operators: complex workflows including detailed technical reviews, regulatory deadlines, and high stakes for reliability and financial performance. Manual processes and siloed tools can’t keep up—leading to backlogs, missed deadlines, and strained stakeholder relationships including challenges associated with:
- Complicated Applications: Validating and transcribing data from forms and attachments is time-consuming and error-prone.
- Queue Backlogs: Interconnection requests can take months or years, creating bottlenecks and risking penalties.
- Regulatory Risk: FERC and state rules impose strict timelines and reporting requirements.
- Transparency Gaps: Interconnection stakeholders demand real-time visibility, which manual processes can’t deliver.
- Speculative Projects: Projects without clear timelines, proper site control, or secured funding, often clog the queue and consume valuable resources.
To meet these challenges, leading transmission owners and operators choose PowerClerk® for a no-code workflow platform that streamlines and scales complex energy and utility processes, improving business performance, reducing operational risk, and modernizing experiences. PowerClerk enables electric utilities to digitize, standardize, and automate interconnection processes all in one flexible system. PowerClerk Intelligence adds AI-powered capabilities that accelerate and optimize processes even further, with features like AI-assisted attachment reviews and machine learning-driven workflow performance insights. Backed by enterprise-grade reliability, continuous innovation, and a dedicated support team, PowerClerk is the trusted solution for energy and utility organizations navigating a rapidly changing energy landscape.
- Trusted by 80+ utilities and energy agencies.
- Proven across over 3 million projects.
- Continuous innovation through 40+ code releases per year.
With PowerClerk, transmission owners and operators can streamline and scale their large load and utility-scale interconnection processes efficiently, enabling them to:
- Customize Workflows: Visualize, configure, modify, and test workflows, including automations for status changes and actions.
- Streamline Processes: Automate intake, validation, routing, and approvals for multi-party processes.
- Expedite Attachment Reviews: Significantly reduce manual review timefor site plans, electrical diagrams, and other documents with human-in-the-loop, AI Attachment Agents.
- Configure Forms: Create and test web forms with drag-and-drop elements, publishable on any webpage for a cohesive experience.
- Consolidate Tasks: Design templates that auto-generate documents with built-in eSignature and ePayment capabilities.
- Automate Communications: Inform applicants and stakeholders of status changes and deadlines via email or custom views.
- Validate & Integrate Data: Sync with IT systems – CIS, GIS, and more to cut duplicate entry and save time.
- Manage Interconnection Data: Create and collect standardized data for load forecasting, grid planning, and operations.
- Enhance Transparency: Share real-time status updates with internal teams and external stakeholders.
- Ensure Compliance: Built-in deadline management, reminders, and reporting meet FERC LGIP and state requirements.
- Streamline Reporting: Visualize workflows, schedule reports, and integrate with Power BI and Excel.
- Drive Continuous Process Improvements: Effortlessly monitor workflow performance and surface hidden bottlenecks through ML-powered Workflow Insights.
- Adapt Quickly: No-code configuration enables rapid response to changing business needs without IT delays.
- Accelerate Timelines: Cut processing time by up to 80%—APS reduced FERC large generator interconnection applications from weeks to days.
Case Study
APS utilizes PowerClerk® to enable efficient, flexible FERC generator interconnection management
Arizona Public Service’s FERC Interconnection team was faced with growing application volume, which strained legacy processes and team bandwidth. Learn how implementing PowerClerk® saved the team time and effort. Check out the case study to learn how digitalizing their FERC interconnection process reduced application processing time from weeks to days.
Ready to simplify your large generator and load request processes?
Contact us and see how PowerClerk can help you streamline workflows, reduce risk, and deliver better experiences.
Learn how utilities and energy agencies can take control of Interconnection Management
Automate customer education for EV, renewable and rate programs using WattPlan®, the utility industry’s only cloud-based software solution.

